Emergency maintenance made easier with new Carbothane DTM Mastic

A field trial in a Philadelphia liquid terminal shows the new Carbothane DTM Mastic is ideal for emergency and spot maintenance.

Building this EV facility for a major manufacturer is a model of flexibility

This EV facility contains a staggering 10 million square feet of floor space. The aggressive construction schedule meant passive fire protection material needed to be strategically chosen and swiftly applied.

The marginally prepared surface of a barge interior void features visible rust and other challenging characteristics.

Carbomastic 15: High-Performance, high-forgiveness maritime asset protection

ASTM D4541 adhesion pull testing of Carboline Carbomastic 15 over a marginally prepared barge surface achieved impressive results. Read why that matters.

The blue hull and white lettering of the ocean supply vessel Harvey Discovery.

12 Years in service and counting for supply ship's hull primer

Carboline inspectors followed an ocean supply vessel closely for over a decade to analyze the performance of Carbomastic 15 applied to its hull. What they learned could have huge implications for shippers.

Opinion: In EV plant construction, specifiers must get creative to stop water vapor transfer

Concrete flooring is instrumental to the anatomy of EV assembly plants, battery manufacturing facilities, and battery recycling operations. But this sector’s building boom will draw in a greater and greater share of specifiers who are likely unfamiliar with the phenomenon of water vapor transfer. Let's close the knowledge gap.